Question: Ship informationAsk an expertAsk an expertAsk an expert done loadingShip information -Vessel can load 54,000 t iron ore maximum

Question: Ship informationAsk an expertAsk an expertAsk an expert done loadingShip information
-Vessel can load 54,000 t iron ore maximum
– Speed : 13 knots
– Bunker consumption: – F.O. at sea 35t per day
– D.O. at sea 2t per day
– D.O. in port 4t per day
-​Price of F.O. $ 110/t.- Price of D.O. $ 155/t.
-​Operating cost: $5000 per day
-​Capital cost: $10,000 per day
Voyage information
-Distance:- Port A/Port B 1,560nautical mile;
​ – Port B/ Port C 2,808 nautical mile
-​loading take about 1 days, discharging take about 2 days,
-​Port Disbursements: (Port Disbursement means: Expenses at port for various heads such as port charges, tugs, pilotage etc. ).
-At Port B $30,000, At Port C $30,000.
-​Other expenses assume $ 3,000.
-​No broker commission
Question:
1、Estimate voyage cashflow (assumed freight rate: $ 20/t.)(15 points)
2、Calculate TCE ($/d). if there is a time charter invitation which rate is $36000/d, which one the shipowner will accept, the time charter invitation or the above voyage charter invitation?(8 points)
3、calculate breakeven rate(7 points)