I need this in 20 minutes, please. MS.54 A toy company needs to calculate material

Question: I need this in 20 minutes, please. MS.54 A toy company needs to calculate material requirements for its top-selling toy truck. The graphic above shows the bill of material for this item. Below are three MRP tables for the top-level assembly (the truck) and some of its components:See the answerSee the answerSee the answer done loadingI need this in 20 minutes, please.
MS.54 A toy company needs to calculate material requirements for its top-selling toy truck. The graphic above shows the bill of material for this item. Below are three MRP tables for the top-level assembly (the truck) and some of its components:
Toy Truck Final Assembly 8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 Gross Requirements 2300 2900 3900 Scheduled Receipts Projected On-Hand Inv. 1,700 Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) 1 Lot Size 200