Question: I need this in 20 minutes. MS.51 An office furniture manufacturer needs to calculate material requirements for one of its most popular office chairs. The graphic above shows the bill of material for this item. Below is the MRP table for the top-level assembly (the chair): Chair Final Assembly 8/1 8/8 8/15I need this in 20 minutes.
MS.51 An office furniture manufacturer needs to calculate material requirements for one of its most popular office chairs. The graphic above shows the bill of material for this item. Below is the MRP table for the top-level assembly (the chair):
Chair Final Assembly 8/1 8/8 8/15 8/22 8/29 9/5 9/12 9/19 9/26 Gross Requirements 250 300 300 450 450 350 450 500 450 Scheduled Receipts 220 360 420 Projected On-Hand Inv. 335 Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) 1 Lot Size 70

Based on the information in the “Chair” table above, what is the Projected On-Hand Inventory quantity in the week of 9/26? What are the Net Requirements in the week of 8/15?
What are the Planned Order Receipts in the week of 9/19?
What are the Planned Order Releases in the week of 9/5?

Chair Final Assembly 8/1 8-Aug 15-Aug 22-Aug 29-Aug 9/5 12-Sep 19-Sep 26-Sep Gross Requir…View the full answer