Bill of Material for Toy Car Assembly Toy Car Final Assembly Wheel Assembly Body

Question: Bill of Material for Toy Car Assembly Toy Car Final Assembly Wheel Assembly Body (1 required) (2 required) Axle Wheel (1 required) (2 required) MS.52 A toy company needs to calculate material requirements for its top-selling toy car. The graphic above shows the bill of material for this item. Below are three MRP tables for the top-level assembly (the car)
Show transcribed image textAnswer: Toy Car Final Assembly The Planned Order Receipts in the week of 8/31 = 280 The Planned Order Releases in the week of 9/21 = 2170 Wheel Assem…View the full answerTranscribed image text: Bill of Material for Toy Car Assembly Toy Car Final Assembly Wheel Assembly Body (1 required) (2 required) Axle Wheel (1 required) (2 required) MS.52 A toy company needs to calculate material requirements for its top-selling toy car. The graphic above shows the bill of material for this item. Below are three MRP tables for the top-level assembly (the car) and some of its components: Toy Car Final Assembly 8/3 8/10 8/17 8/24 8/31 9/79/14 9/21 9/28 2200 Gross Requirements 800 1000 1800 310 320 710 Scheduled Receipts Projected On-Hand Inv. Net Requirements 140 Planned Order Receipts | Planned Order Releases 1 Lead Time (in weeks) Lot Size 70 Wheel Assembly Gross Requirements | 8/3 8/10 8/17 8/24 8/31 9/7 9/14 9/21 9/28 1800 2200 2100 Scheduled Receipts Proiected On-Hand Inv. Projected 700 Net Requirements Planned Order Receipts Planned Order Releases || IN || | || 2 Lead Time (in weeks) Lot Size 150 Axle 8/3 8/10 8/17 8/24 8/31 9/7 9/14 9/21 9/28 Gross Requirements Scheduled Receipts 700 1600 300 Projected On-Hand Inv. Net Requirements Planned Order Receipts Planned Order Releases Lead Time (in weeks) Lot Size 2 200 For the Toy Car table above, what are the Planned Order Receipts in the week of 8/31? Number For the Toy Car table above, what are the Planned Order Releases in the week of 9/21? Number For the Wheel Assembly table above, what are the Gross Requirements in the week of 9/7? Number For the Wheel Assembly table above, what is the Projected On-Hand Inventory in the week of 8/31? Number For the Wheel Assembly table above, what are the Net Requirements in the week of 8/24? Number For the Axle table above, what are the Gross Requirements in the week of 9/7? Number For the Axle table above, what are the Gross Requirements in the week of 9/14? Number For the Axle table above, what are the Planned Order Releases in the week of 8/17? Number T